Hydro-excavation methodology short film
The two minute hydro-excavation methodology video
In support of the Trenchless Technologies print documents and the Case Studies section of the TruLine Civil website I was also commissioned to shoot and edit a two minute video clip of the resources and methods used for Hydo-Excavation in Christchurch city when installing the ultra-fast fibre network to businesses downtown.
Credits
Shooting: MagentaDot Brands
Director / editor: Thomas Rands
©magentadot brands







The 1.5m box culvert sections were crane lifted in and laid on the compacted granular backfill to the precise, g.p.s. specified line and laser-proven grade and depth. The bedding design for the box culvert was designed by the Opus Engineer who is knowledgeable about the Arthur’s Pass ground conditions which thereby ensured a successful installation.



Have just completed the multi-disciplinary set of tasks necessary to prep and publish a new portfolio of the location photo shoot for Tru-Line Civil last month in Akaroa. This new work/photography portfolio item can now