Mingha Bluff culvert install 3

| << Install Gallery 2  | Gallery 4 >> |

Excavation and preparation of the box culvert bedding foundation

Tru-Line Civil Logo. Brands for New Zealand companies, Greymouth, New Zealand.The successful installation of precast box culverts begins with special site preparation for the foundation, typically referred to as bedding, on which the culvert will rest. TruLine Civil is an experienced Box Culvert installation contractor who understands the importance of bedding the culvert structure properly. The excavation cut was down to 4.8m below the rails.
Keep on reading!

Mingha Bluff culvert install 2

| << Install Gallery 1 | Gallery 3 >> |

Precast reinforced concrete box culverts

Tru-Line Civil Logo. Brands for New Zealand companies, Greymouth, New Zealand.Precast concrete box culverts are steel reinforced. There are several accepted ways to install the reinforcement and the overburden appropriately sizes the amount of steel reinforcement needed.

This box culvert has specific loads associated with this site and conditions of use in a high rainfall alpine area on the River Bealey riverbed beneath the Tranzalpine railway. These conditions include burial depth, rail traffic, waterway loading, and impact loadings. The reinforcement in these box culverts is significant and that same reinforcing along with quality concrete and installation by TruLine Civil ensures at least a 100 year life cycle of service for this valuable component of infrastructure.
Keep on reading!

Mingha Bluff box culvert install 1

Install Gallery 2 >> |

Documentary photography project overview

Tru-Line Civil Logo. Brands for New Zealand companies, Greymouth, New Zealand.

This is the first of a series of 5 galleries documenting the install of a 10.5m reinforced concrete box culvert beneath the Christchurch – Greymouth “Tranzalpine” railway shot on the night of Sunday July 3, 2016 for client TruLine Civil’s website case study portfolio project. MagentaDot Brands documented the methodology for installing one of six under-rail reinforced concrete box culverts. Part of a package of civil works, TruLine Civil is delivering to the Mingha Bluff road realignment project.
Keep on reading!

Eurowood website showcase mockup displaying 3 different site page templates, the homepage, a product catalogue item page and the current projects news / blog page.

EuroWood web design & brand launch

Eurowood different engineered timber log profiles, different laminated timbers.

Eurowood different engineered timber log profiles, different laminated timbers.

The launch of New Zealand’s new solid wood, interlocking timber building construction firm EuroWood Construction’s information and promotional website and news blog in December 2014 was a combined brand launch and website design project. It has been well received by the client and their market. The project was a collaboration between MagentaDot Brands, Identity Signs, and the client who content managed/populated the site.
Keep on reading!

Pilot drillshot, the bit enters and passes through the 5m entry pit, Horizontal Directional Drilling, Tru-Line Civil, documentary photography, Parklands West, Christchurch, New Zealand, Gravity Wastewater Replacement, HDD

HDD case study shoot: Parklands

Continuing the ongoing project to photograph the client, TruLine Civil’s range of work methodologies and then follow through by writing them up as Case Studies on their website. I was contracted to document the span of a day on location in Akaroa. The brief is to record a fine-grained record of TLC’s capability in the relatively new Civil Engineering field of “Trenchless Technology”, in this case specifically Horizontal Directional Drilling (HDD). This fast and highly accurate “Horizontal Infrastructure” laying technique is achieved by way of a synchronised deployment of highly skilled and experienced operators, high tech machinery and tight coordination between the project team members. From skilled labourers and drivers up the chain to the site engineer—close communication is maintained between the project team members via modern telecommunications.
Keep on reading!

Horizontal Directional Drilling, Tru-Line Civil, Akaroa, documentary, photography, Akaroa Water Supply Stage 3, Reticulation Upgrade, Vermeer HDD,

HDD drilling method photoshoot Akaroa

Tru-Line Civil logoHave just completed the multi-disciplinary set of tasks necessary to prep and publish a new portfolio of the location photo shoot for Tru-Line Civil last month in Akaroa. This new work/photography portfolio item can now be viewed here on the MagentaDot site, and in the form of a new case study page I’ve loaded onto the Tru-Line Civil website. The set of prep tasks mentioned has included:
Keep on reading!

TruLine Civil horizontal drilling rig, Akaroa

HDD photo shoot Akaroa

Tru-Line Civil logoAs part of the ongoing project to visually record the client’s range of work methodologies I was contracted to document the span of a day on location in Akaroa.

The brief was to capture a fine-grained record of TLC’s capability in the relatively new Civil Engineering field of “Trenchless Technology”, specifically Horizontal Directional Drilling (HDD).
Keep on reading!