Steel 90° “elbow” bend to be welded into in the main sewage line at over 4m depth in very challenging, saturated sandy ground. Horizontal Directional Drilling, Tru-Line Civil, documentary photography, Parklands West, Christchurch, New Zealand, Gravity Wastewater Replacement, HDD.

Steel 90° “elbow” bend to be welded into in the main sewage line at over 4m depth in very challenging, saturated sandy ground.

Category:

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s