The 5m entry pit, Horizontal Directional Drilling, Tru-Line Civil, documentary photography, Parklands West, Christchurch, New Zealand, Gravity Wastewater Replacement, HDD

The steel sheet-pile clad 5m entry pit into water saturated running sand. At bottom of pit is 500mm diameter pumping sewer from Belfast Freezing works.

Category:

Leave a comment