The crew detach the back reaming head from the drill stem and remove it from the entry trench prior to relocating the HDD drilling rig to the next drill site for the day.
Category:
The crew detach the back reaming head from the drill stem and remove it from the entry trench prior to relocating the HDD drilling rig to the next drill site for the day.