Horizontal Directional Drilling, Tru-Line Civil, Akaroa, documentary, photography, Akaroa Water Supply Stage 3, Reticulation Upgrade, Vermeer HDD,

Using the Hydro-vac suction truck to remove the cuttings and drilling fluid slurry from the entry trench in preparation for detaching the pipeline and back reaming head from the drill stem.

Category:

Leave a comment