The Hyro-vac truck crew performing ground pressure release and ‘frac-out’ clean-up tasks. During the back-reaming process, the main objective is to mix the cuttings from the back reamer with the drilling fluid to create a slurry that can be displaced to the side of, or discharged out of, the bore hole to allow room for the product being pulled back to the HDD drilling unit.