Horizontal Directional Drilling, Tru-Line Civil, Akaroa, documentary, photography, Akaroa Water Supply Stage 3, Reticulation Upgrade

Completion of the 125mm Ø pilot drill-shot in the receiving trench. The crew switch the drill head for the back reaming head, prior to attaching 120m long x 180mm Ø pipeline for pull-back to entry trench.