Mingha Bluff culvert install 2

| << Install Gallery 1 | Gallery 3 >> |

Precast reinforced concrete box culverts

Tru-Line Civil Logo. Brands for New Zealand companies, Greymouth, New Zealand.Precast concrete box culverts are steel reinforced. There are several accepted ways to install the reinforcement and the overburden appropriately sizes the amount of steel reinforcement needed.

This box culvert has specific loads associated with this site and conditions of use in a high rainfall alpine area on the River Bealey riverbed beneath the Tranzalpine railway. These conditions include burial depth, rail traffic, waterway loading, and impact loadings. The reinforcement in these box culverts is significant and that same reinforcing along with quality concrete and installation by TruLine Civil ensures at least a 100 year life cycle of service for this valuable component of infrastructure.
Keep on reading!

Mingha Bluff box culvert install 1

Install Gallery 2 >> |

Documentary photography project overview

Tru-Line Civil Logo. Brands for New Zealand companies, Greymouth, New Zealand.

This is the first of a series of 5 galleries documenting the install of a 10.5m reinforced concrete box culvert beneath the Christchurch – Greymouth “Tranzalpine” railway shot on the night of Sunday July 3, 2016 for client TruLine Civil’s website case study portfolio project. MagentaDot Brands documented the methodology for installing one of six under-rail reinforced concrete box culverts. Part of a package of civil works, TruLine Civil is delivering to the Mingha Bluff road realignment project.
Keep on reading!

Horizontal Directional Drilling, Tru-Line Civil, Akaroa, documentary, photography, Akaroa Water Supply Stage 3, Reticulation Upgrade, Vermeer HDD,

HDD drilling method photoshoot Akaroa

Tru-Line Civil logoHave just completed the multi-disciplinary set of tasks necessary to prep and publish a new portfolio of the location photo shoot for Tru-Line Civil last month in Akaroa. This new work/photography portfolio item can now be viewed here on the MagentaDot site, and in the form of a new case study page I’ve loaded onto the Tru-Line Civil website. The set of prep tasks mentioned has included:
Keep on reading!