Pilot drillshot, the bit enters and passes through the 5m entry pit, Horizontal Directional Drilling, Tru-Line Civil, documentary photography, Parklands West, Christchurch, New Zealand, Gravity Wastewater Replacement, HDD

Pilot drillshot, the bit enters and passes through the 5m entry pit, exiting on steel walls on the opposite side through a pre-cut exit hole only 50m larger than the pilot bit. TruLine Civil’s drainlayer is in radio contact with the HDD operator 30m away.

Category:

Leave a comment