Mingha Bluff culvert install 4

Menu

Skip to content
  • Home
  • About
    • The Waughpath
    • Design from a Creative Brief
    • Creative print design
    • Terms of service
    • Client Proofing
      • National Weavers Exhibition
  • The work
    • Advertising & Promo
      • Advertising design work
      • Brochure design
      • Poster design
      • T Shirts & other
      • Social Media
      • Writing & Research
    • Brand & identity systems
      • What makes a good logo?
      • Business Naming Service
      • Rename & Rebrand
    • Case studies & awards
      • Bionona brand presentation
    • Corporate communications
    • Illustration
    • Packaging design
    • Photography
      • Classic motorcycle racing photography
        • Burt Munro 2015 Event
      • Composite images
      • Documentary photography
      • Event photography
      • Phil Price Sculpture
      • Photojournalism
        • The right picture: Batavia, old harbour of Jakarta
      • Travel photography
      • Wildlife photography
    • Video production
    • Web Design
      • Energise an image-heavy website
      • Web design overview
  • ARCHIVE
    • Advertising & Promo
    • Identity
      • Vinevax creative brief & presentation
    • Illustration
    • Packaging design
    • Web Design
  • shop
    • Shop Mens
    • Shop Womens
    • Surface Active wildlife art prints
    • About Surface Active Limited Edition Fine Art Prints
    • Surface Active: A Retrospective of New Zealand Printmakers Chrissie Terpstra & Shaun Waugh (1986–2021)
  • Blog
  • Contact

Mingha Bluff culvert install 4

2003_Culvert_4_north-8697_2
2003_Culvert_4_north-8698_2
2003_Culvert_4_north-8701_2
2003_Culvert_4_north-8702_2
2003_Culvert_4_north-8704_2
2008_Micro_adjust_culv-8706_2
2008_Micro_adjust_culv-8707_2
2008_Micro_adjust_culv-8711_2
2008_Micro_adjust_culv-8713_2
2013_Culv_5_prep-8718_2
2013_Culv_5_prep-8722_2
2013_Culv_5_prep-8725_2
2013_Culv_5_prep-8726_2
2013_Culv_5_prep-8730_2
2013_Culv_5_prep-8732_2
2018_Culvert_5_crane-8733_2
2018_Culvert_5_crane-8735_2
2018_Culvert_5_crane-8736_2
2018_Culvert_5_crane-8737_2
2018_Culvert_5_crane-8739_2
2018_Culvert_5_crane-8743_2
2023_Culv_5_micro_adj-8746_2
2023_Culv_5_micro_adj-8748_2
2023_Culv_5_micro_adj-8752_2
2023_Culv_5_micro_adj-8754_2
2023_Culv_5_micro_adj-8757_2
2023_Culv_5_micro_adj-8760_2
2031_Culvert_6_Crane-8761_2
2031_Culvert_6_Crane-8766_2
2031_Culvert_6_Crane-8767_2
2031_Culvert_6_Crane-8769_2
2031_Culvert_6_Crane-8770_2
2031_Culvert_6_Crane-8777_2
2040_Prep_tierods-8785_2
The continuous insertion of the 6 x 10.5m long high-tension steel rebars longitudinally into the culvert is a team effort.
The continuous insertion of the 6 x 10.5m long high-tension steel rebars longitudinally into the culvert is a team effort.
2040_Prep_tierods-8787_2
2043_Crane_culv_6_in_interior-8790_2
2043_Crane_culv_6_in_interior-8792_2
2043_Crane_culv_6_in_interior-8793_2
2043_Crane_culv_6_in_interior-8794_2
2043_Crane_culv_6_in_interior-8795_2
2043_Crane_culv_6_in_interior-8797_2
2047_Seal_culvert_5-8799_2
2048_Tierods_upper_push-8803_2
2048_Tierods_upper_push-8808_2
2054_Prep_bedding-8813_2
2058_Crane_culv_6-8820_2
2058_Crane_culv_6-8822_2
2058_Crane_culv_6-8823_2
2058_Crane_culv_6-8825_2
2058_Crane_culv_6-8826_2
2058_Crane_culv_6-8827_2

8:00–9:00pm placement of downstream end and final 3 upstream culvert sections

Tru-Line Civil Logo. Brands for New Zealand companies, Greymouth, New Zealand.The 1.5m box culvert sections were crane lifted in and laid on the compacted granular backfill to the precise, g.p.s. specified line and laser-proven grade and depth. The bedding design for the box culvert was designed by the Opus Engineer, who is knowledgeable about the River Bealey riverbed ground conditions, which thereby ensured a successful installation.

The proper installation of precast concrete box culvert typically starts at the downstream end and works back up stream with the culvert spigot end facing downstream and the bell end facing the upstream side. Variance from this norm was required to ensure the centre section of the culvert conformed to the precise depth beneath the rails specified. Once the centre section was accurately placed, installation proceeded first downstream, then upstream of the centre. These installation practices were consistent with the engineer’s design assumptions.

Overview of the under-rail culvert installation

These culverts are one component of a package of civil works that TruLine is delivering to their client, Hawkins Infrastructure. The Mingha Bluff Realignment is of a section of State Highway 73 within Arthurs Pass National Park between Mingha Bluff and Rough Creek, just to the East of Arthurs Pass village. This is is a narrow, winding section of road that threads through dense mountain beech rainforest. It is a challenging section of road to drive because it consists of two opposing lanes which have a series of very tight blind corners, leading to poor visibility and other objective risks, like narrow sections between steep bluffs and drop-offs. To manage the objective risks the Mingha Bluff section of the highway demands high levels of care and attention from all road users. In many places the two-lane road is so narrow it has no shoulder.

NEXT GALLERY, MINGHA BLUFF 5

Search

Select language to translate

Client Industry | Clients | Context | Era | Genre | Subject

Magenta Dot Meta

  • Login
  • RSS
  • Comments RSS

Enter your email address to follow this blog and receive notifications of new posts by email.

Join 329 other subscribers

Join the Dot on Facebook

Join the Dot on Facebook
Follow MagentaDot Brands on WordPress.com
Blog at WordPress.com.
  • Subscribe Subscribed
    • MagentaDot Brands
    • Join 89 other subscribers
    • Already have a WordPress.com account? Log in now.
    • MagentaDot Brands
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Copy shortlink
    • Report this content
    • View post in Reader
    • Manage subscriptions
    • Collapse this bar
 

Loading Comments...